We are in process of building a new meeting location for the Church of Jesus Christ Clinton Restoration Branch in Clinton, Missouri.
Herschberger Construction marking the building location.
Preparing the ground.
Footings dug.
Footings being poured.
No rain! Elite Plumbing was available to work.
Rough -in plumbing being installed. This portion includes the bathrooms and baptismal font area.
Getting rough-in plumbing in between rains.
Wow!! Look at all the pipes.
About ready for the concrete.
Looks like a huge mopping project...
Working quickly.
Look how shiny the concrete is getting.
The expansion joints are being cut.
Ready Set Go...After waiting so long to start things went fast!!!
Don't think would like this job. Would you??
Things are taking shape.
Looks like great fun. Last truss going up.
The clouds were pretty. The steel had a vantastic backdrop.
The evening sun made the steel gleam!!
Preparing for the roof installation. Facia being placed.
Zip sheeting going on along with the windows.
In side view with the first of the zip sheeting attached. Once again the beauty of the sky is visible thru the trusses.
Excitement continues to build.
Siding, windows and part of the doors installed.
Picture from the north side.
Windows delivered from Peerless.
Front door before it was uncrated.
Front door will soon be installed. Can't wait.
The Roof is going on. One side then over the peak to the other side.
Taking roofing material up for installation.
Close up of the roof.
Waiting for the front door to be installed.
Picture of entrance from the inside.
Picture of the entrance.
Evergy beginning the first steps to placing power source on site.
Electric pool is up and transformer in place. Getting closer to having electricity.
Look what Helm's have added!! All part of the new requirements in getting a meter.
Look at the light inside.
Seeing the light come thru the windows and doors is beautiful!!
The first stage of getting a building driedd in has been completed.